Artesian Modern
5/18/2023
We finished framing (wood and steel) and are now installing windows. The exterior walls of this house is about 70% glass!
8/24/2022
Pouring foundation on 10,000 sqft house. Approximately 370 tons of big rock fly ash concrete mix from Robertson’s being pumped by Alliance Concrete Pumps through a 4″ line.
6/15/2022
Final conceptual 3D rendering approved for construction drawings.